When flooding from a massive rainstorm in May 1995 killed six people, Congress authorized the Southeast Louisiana Urban Flood Control Project, or SELA.
Over the next 10 years, the Army Corps of Engineers, tasked with carrying out SELA, spent $430 million on shoring up levees and building pumping stations, with $50 million in local aid.
But at least $250 million in crucial projects remained, even as hurricane activity in the Atlantic Basin increased dramatically and the levees surrounding New Orleans continued to subside.
Yet after 2003, the flow of federal dollars toward SELA dropped to a trickle.
The [U.S. Army Corps of Engineers] never tried to hide the fact that the spending pressures of the war in Iraq, as well as homeland security -- coming at the same time as federal tax cuts -- was the reason for the strain.
No comments:
Post a Comment